* Disclaimer: OveReview is reader-supported. We earn commissions from qualifying purchases
Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A) Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A) Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A)

Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A)

Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A) Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A) Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A)
$ 229.95

Score By Feature

Based on 20 ratings
Satisfaction
9.90
Value for money
9.50
Packaging
9.70
Customer service
9.70

OveReview Final Score

How Our Score Is Calculated

Product Description

Your model number must be entered in order for this to work.
Provides circuits for generators and utilities using different frequency codes: 50A and 100A.
Throughout the day, generators are isolated from utilities by breaker mechanisms that are locked.
Up to 12,500 Watts may be generated by electricity generators for services.
Use it as an indoor ceiling panel, or use it in conjunction with a sub-panel if it is located in an attic.
The provisions for seven to fifteen circuits in this category.

Questions & Answers

The design is designed for use indoors or outside. ?

Thank you for your inquiry!... It can be used in a variety of ways indoors. If you have any additional questions, please contact us.

Is it possible to use a 200 amp main breaker box for one feed and an e with a 200 amp main breaker box for one feed and a 50 amp generator for the other feed?

Utility capacity ranges from 100 to 500 amp and generator capacity from 50 to 80 amp. There are also models available as TTV2005C or TWB2005Dr. 200 amp generator input is not required, but 50 amp generator input is. More information about the 200 amp panels can also be found on Reliance Controls' website.

What would happen if I connected the main lines from the service panel to the 100amp breaker then wired the 100amp breaker back from the main service panel joints the main lines from the service panel to the 100 amp breaker then wire from the 100 amp breaker back to the main service panel lugs ?

There is a max of 100 amps of utility (from the main load center) and 50amp of generator (for the generator). The TRB1055C is rated for both inputs. In case you do not already know, please visit the Reliance Controls web site. A provider of dependencecontrols. You can find an installation guide on https://www.

Selected User Reviews For Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A)

In my hands, I have complete control
5/5

Having to do the installation himself proved to be a challenge, but an electrician ultimately did it. There is no problem with it. As an alternative, I installed and activated an 8 circit-positive Siemes 4/8 box. I then fed the power from the transfer switch. I have a whole house fridge with a microwave, along with several lights, all in my hand.

Izaiah Boone
Izaiah Boone
| Sep 29, 2021
Advertisements describe the outcome as advertised
5/5

We were pleased with how this product performed. Please be sure that the instructions have been completed if the quality is good. Would recommend it, and it's not very difficult.

Destiny Zamora
Destiny Zamora
| Sep 16, 2021
love it! Here is what exactly it should be able to do
5/5

Product quality.

Richard Benson
Richard Benson
| Oct 08, 2021

Related Products For Reliance Controls TRB1005C Panel/Link Transfer Panel with Meters (50A/100A)